Who we serve

A design-build firm back office that tracks design and construction together

A design-build firm back office handles bookkeeping, job costing, calls, scheduling and estimating for a company that sells design and construction under one contract. DeeperBench runs those functions on one system, tracks design-phase and build-phase costs separately, and has a named person approve AI-drafted work before it goes out.

What makes a design-build back office different?

A design-build firm has two businesses inside one contract. The design phase is a professional-services job: hours, drafting, renderings, revisions. The build phase is a construction job: materials, subs, labor, change orders. They run on different clocks and different margins, and they are usually sold to the same homeowner a few weeks apart.

Most small-business bookkeeping treats that as one pile. The design deposit lands in income, the architect's invoice lands in expenses, and nobody can tell whether the design phase pays for itself or is quietly subsidized by the build. That is the problem this page is about.

Where does design-build admin break down?

  • Design fees without a budget. Revisions pile up and the fee stays the same. Nobody notices until the design hours are spent and the homeowner wants one more round.
  • The handoff. The estimate built during design has to turn into a build budget, and the two often live in different files.
  • Deposits and phase billing. Design retainers, pre-construction fees and construction draws all need clean treatment so cash is not mistaken for profit. Confirm the exact treatment with your CPA.
  • Long lead cycles. A project may sit in design for months. Calls and follow-up during that window decide whether the build contract is signed.

Worked example (illustrative). A design agreement is $18,000. The designer logs 140 hours at a loaded cost of $60 an hour, which is $8,400. Outside drafting costs $2,100. Design margin is $18,000 minus $8,400 minus $2,100, or $7,500, about 41.7%. Two extra revision rounds add 40 hours, or $2,400. Margin falls to $5,100, about 28.3%. Same fee, 13 points of margin gone, and without hours coded to the project, nobody sees it.

What does DeeperBench do for a design-build firm?

We keep design and construction costs on the same project but in separate phases, so you can read each on its own and together.

  • Phase-level job costing. Design hours, outside consultants and construction costs coded to the project and phase. See bookkeeping and fractional CFO.
  • Design-to-build estimating. AI-assisted estimates built from your priced catalog, checked by a person, so the pre-construction number and the build budget start from the same data. See estimating.
  • Calls, messages and follow-up. Inquiries answered and booked, and long-cycle prospects kept warm with follow-up that you approve. See customer service and scheduling.
  • Project planning support. Kickoff checklists and handoff structure through project planning and management consulting.

What do you keep, and what do we not do?

You keep design, client relationships, sales, project management and the crews. We do not provide design services, we do not stamp drawings, and we do not decide design scope. We also do not give legal or tax advice on how your design fees or deposits should be treated. That is for your attorney and CPA.

Who approves what?

AI drafts the routine work: coding a bill, summarizing a call, assembling an estimate. A named person approves before anything reaches a client or posts to the live books. Estimates that carry design judgment come back to your designer or project lead for sign-off.

Checklist: set up design-build tracking in a week

  1. Split each project into at least two phases: design and construction.
  2. Give design work an hours budget, not just a fee.
  3. Code consultant and drafting invoices to the design phase.
  4. Record deposits and draws as billings against the right phase.
  5. Review design-phase margin at each revision round.

Is it a fit?

It fits owner-led design-build firms at roughly $2M to $20M that sell design and construction together. It is not a fit if you only do construction (see remodelers), if you want us to design, or if you expect unreviewed automation. One case study point: Black River Design Build, a design-build remodeler, has 204 build projects on the platform (unaudited production data, 7 October 2026).

How does the design-to-build handoff work?

The handoff is where design-build firms either keep the advantage of the model or lose it. If the pre-construction estimate sits in one file and the build budget in another, the two drift apart. We keep the estimate, the signed scope and the job budget linked, so when the build contract is signed the budget is a continuation of what the homeowner already saw, not a rebuild. Your project manager still owns the kickoff and the scope conversation. Our sales to production handoff guide covers what belongs on the checklist.

Next step

Read how it works or ask for a demo. You can also contact us and describe how you sell today.

Common questions

Can you separate design fees from construction margin?

Yes. We set up each project with design and construction phases and code costs to each. That lets you see whether design pays for itself and what the build earns.

Do you do the design work?

No. You keep design, along with sales and project management. We handle the back office around it.

How should design deposits be recorded?

That depends on your accounting method and jurisdiction. We can set up tracking so deposits and draws are visible, but confirm the treatment with your CPA.

Can you help with estimates before the design is final?

We can draft pre-construction estimates from your priced catalog and past jobs. A person reviews them, and your designer confirms anything that depends on design decisions.

Related reading

You keep the build. We run the back office.

Tell us what is running your office today and which function to move first.

Talk to the team