A chart of accounts for remodelers separates revenue, direct job costs (labor, subs, materials, permits), overhead, and contract balance-sheet accounts like retainage and customer deposits. Jobs are tracked with a job or class tag, not separate accounts. Keep it to about 50 to 75 accounts you will actually use.
What is a chart of accounts, and why does a remodeler need a different one?
A chart of accounts is the list of categories your accounting software uses to sort every transaction. Most default charts are built for retail or services. They have one "Cost of goods sold" bucket and a pile of generic expenses. A remodeler needs to see direct job costs by type, overhead separated from them, and a few balance-sheet accounts that hold money which is not yet income.
Get this wrong and the books never answer the question you care about: what did each job really cost?
How should you structure it?
Use accounts for what kind of cost it is and the job tag for which job it belongs to. Do not create accounts per job. Jobs belong in the job or class feature of your software. Here is a workable skeleton. Numbers are a convention, not a rule.
| Range | Section | Examples |
|---|---|---|
| 1000s | Assets | Checking, Accounts receivable, Retainage receivable, Costs in excess of billings, Deposits paid |
| 2000s | Liabilities | Accounts payable, Retainage payable, Customer deposits (billings in excess), Credit cards, Loans |
| 3000s | Equity | Owner's equity, Owner draws, Retained earnings |
| 4000s | Revenue | Remodeling revenue, Service revenue, Design revenue, Change order revenue |
| 5000s | Direct job costs | Direct labor, Subcontractors, Materials, Permits and fees, Equipment rental, Dumpsters and disposal, Warranty |
| 6000s | Overhead | Office salaries, Owner pay, Vehicles, Insurance, Software, Marketing, Rent |
| 7000s | Other income / expense | Interest, Gain or loss on assets |
Some firms add sub-accounts under direct costs for each phase or trade, such as demolition, framing or finish. That is useful if you budget that way. Do not go further than you will really use.
What are the common mistakes?
- Costing in overhead. Project manager wages, truck costs and field supplies get lumped in with office overhead. Decide which indirect costs you allocate to jobs and be consistent. The NAHB Remodelers' study notes that its operating-expense figure includes owner pay and indirect construction costs, so comparing yourself with benchmarks needs the same definitions.
- One "Subcontractors" account with no job tag. You know the total but not which jobs it belongs to.
- Customer deposits in revenue. A deposit is a liability until work is done. How you treat it for reporting is for your CPA.
- Retainage not tracked. If retainage is not tracked on its own, receivables look larger than what can be collected now. See retainage explained.
- Too many accounts. A chart with 200 lines makes coding slow and inconsistent. Fifty to seventy-five is plenty for most small firms.
- Owner draws as expenses. Draws are equity, not cost.
How do you set it up in QuickBooks?
The steps are similar in most platforms. Do this with your bookkeeper or CPA, since changes affect historic reports.
- Export your current chart and last 12 months of transactions.
- Draft the new structure on paper using the table above. Delete what you do not use.
- Decide how you will track jobs, either with customer:job records or a class or project feature. Pick one.
- Rename and merge accounts rather than deleting accounts with history. Merging combines the balances.
- Add the contract-related balance sheet accounts: retainage receivable and payable, customer deposits, and costs or billings in excess.
- Create rules or a coding guide so that the same invoice always lands in the same account.
- Review a month of results and fix what does not read well.
Illustrative example. A remodeler pays a $12,000 framing sub for a kitchen job. In a default chart this lands in "Contract labor." In the structure above it lands in "5100 Subcontractors" tagged to the kitchen job, so job cost shows $12,000 of subcontractor cost against a $15,000 budget line. The monthly P&L by job now shows a remaining $3,000 for framing.
How should phases, change orders and warranty work be coded?
Three situations come up in almost every remodeling company.
- Phases. If you budget by phase, use a sub-level in the job structure, not extra accounts. That way you can compare budget and actual for demolition or finish work without cluttering the chart.
- Change orders. Record approved changes against the same job, either as an increase to contract value with its own revenue line or as a separate job. Pick one method. Unsigned changes should not be billed or booked as revenue.
- Warranty and callbacks. Give them their own direct-cost account, tagged to the original job when practical. Otherwise callbacks make the original job look better than it was, and the cost vanishes into overhead.
What coding rules keep it consistent?
A chart is only as good as the habits around it. A one-page coding guide helps whoever enters bills, whether that is you, an office manager or a bookkeeper. It should say, in plain words:
- Every bill and card charge gets a job, or is marked overhead on purpose.
- Materials bought for stock go to an inventory or overhead account until used.
- Field labor is coded to the job; office labor is overhead.
- Anything unclear goes to a "needs review" list, not to a guess.
Review that list weekly. It tends to shrink once vendors and categories are set up.
How many accounts should the chart have?
As few as let you answer your management questions. Ask what you want to know each month: margin by job, by job type, overhead against revenue, retainage outstanding. Build accounts only for those. Add detail when you need it, not before.
What does DeeperBench do here?
When we take on a client's books, setting up or fixing the chart of accounts and job structure is part of the onboarding for our construction bookkeeping service. We draft the structure, you and your CPA approve it, and a bookkeeper applies it. See the finance service overview, or send us your current chart and we will tell you what we would change.
Common questions
Should I create an account for every job?
No. Track jobs with the job, class or project feature in your accounting software. Accounts describe the type of cost, and the tag says which job it belongs to.
Where do project manager wages go?
It depends on whether you allocate indirect costs to jobs. Pick a method with your CPA and use it consistently, so margin by job means the same thing every month.
Can I change my chart of accounts mid-year?
Yes, usually by renaming and merging accounts. Do it with your bookkeeper or CPA so historic reports and tax categories still line up.
Do I need a different chart if I am not on QuickBooks?
The structure is the same in any platform. Only the setup steps for jobs and classes differ.