Design-Build Accounting Basics for Remodelers

Design-build accounting tracks two kinds of work on one client: design fees, earned as design hours are delivered, and construction, earned as the build progresses. Keep them in separate phases with their own revenue, costs and margin, so a profitable build cannot hide an unprofitable design stage.

Why is design-build accounting different?

A design-build firm sells design and construction under one roof, often in two contracts. The design phase is mostly salaried or hourly time: designer, drafter, estimator, project manager. The construction phase is labor, materials and subs. The risks differ. Design runs on hours and scope creep. Construction runs on materials, productivity and change orders.

If both land in one "job" with no phase split, you cannot tell whether design is paid for by its fee or subsidized by construction. Many firms do the latter on purpose, as a sales cost. That is fine if you know it and have chosen it.

How should you set up jobs and cost codes?

  1. One client job number, with at least two phases: design and construction.
  2. Separate income accounts for design fees and construction revenue.
  3. Time tracking for design staff by job and phase. Without hours, design cost is a guess.
  4. A labor rate for each designer or drafter, loaded with payroll taxes and benefits.
  5. Cost codes for outside design services such as engineers, surveys and renderings.
  6. A rule for pre-sale work: free concept time is marketing or overhead, and design under contract is job cost. Write the cutoff down.

This extends the structure in our chart of accounts guide.

How do you account for design fees paid up front?

A design deposit collected before the work is done is generally not revenue yet. It is a liability, often called unearned revenue or customer deposits, until the design is delivered. One common method recognizes revenue as design hours are completed. The right method for your company depends on your contract terms and your accounting standards, so confirm it with your CPA.

Illustrative example (not real company data). A client signs a $12,000 design agreement, paid in full on signing. The design is budgeted at 150 hours. Loaded designer cost: $48 per hour.

  • Budgeted design cost: 150 x 48 = $7,200.
  • Budgeted design margin: (12,000 - 7,200) / 12,000 = 40.0%.
  • After 90 of 150 hours (60%) the earned portion is 12,000 x 0.60 = $7,200, and $4,800 is still a liability.
  • If the design takes 210 hours instead, cost is 210 x 48 = $10,080. Margin falls to (12,000 - 10,080) / 12,000 = 16.0%.

The overrun of 60 hours cost $2,880 (60 x 48), which is 24% of the fee. Without hours by job, the loss gets buried in payroll.

What happens when the design fee is credited to construction?

Many firms credit all or part of the design fee against the build contract. Treat that as a pricing choice, not a hidden discount. Record the design fee as design revenue when earned. Show the credit as a reduction of the construction billing, per your contract. Then check combined margin across both phases.

Illustrative continuation. The client signs a $180,000 construction contract that credits the $12,000 design fee, so total revenue across both phases is $180,000 and the client pays $168,000 more. Construction direct cost is $130,000. Design cost is $7,200. Total cost is $137,200. Combined gross profit is 180,000 - 137,200 = $42,800, or 23.8% of $180,000.

If you compared the construction phase alone, $168,000 against $130,000, you would see $38,000 of profit and a 22.6% margin. The design phase added $4,800 of profit on its own, which accounts for the gap (38,000 + 4,800 = 42,800). Reporting both views tells you whether design earns its keep and whether you are pricing the build against the right total.

What should you report each month?

  • Design fees billed, earned and deferred, by client.
  • Design hours budgeted against actual, by job.
  • Design margin and construction margin, separately and combined.
  • Design agreements signed against agreements converted to builds. Conversion rate decides whether design is a profit center or a marketing cost.
  • Construction WIP with over/under billing. See the WIP report guide.

What mistakes come up most?

  • Treating design deposits as income on receipt and overstating profit in the month they arrive.
  • No time tracking for designers, so design cost is a guess.
  • Letting design scope grow without a change fee or amendment.
  • Costing design time into construction jobs only when the build is signed, which understates the cost of lost deals.
  • Using one margin target for both phases when they carry different risks.

What about retainers, allowances and selections?

Design-build jobs carry a few items that confuse the books if you leave them loose.

  • Retainers and pre-construction fees. Treat them like design deposits: record the cash, hold it as a liability, and release it to revenue as the work is delivered under your agreed method.
  • Allowances. An allowance is a placeholder price for something not yet chosen, like tile or fixtures. Track actual selections against the allowance by job, and bill the difference through a signed change order, so overages are not absorbed.
  • Owner-purchased items. If the client buys fixtures directly, keep them out of your revenue and cost, and note the arrangement in the contract.
  • Third-party design. If you pass through an architect or engineer, decide whether you bill at cost or with a markup, and code it to the design phase either way.

A short monthly review keeps all of this honest. For each open job, compare design hours to budget, allowances to selections, and billed to earned. If a number looks off, fix it while the client is still engaged. Revenue recognition and tax treatment of deposits depend on your contracts and jurisdiction, so work through the details with your CPA.

Where does DeeperBench fit?

DeeperBench's finance and bookkeeping service sets up phase-level job costing for design-build firms, codes time and expenses to the right phase, and produces the monthly design and construction view. AI drafts coding and reports, and a named person approves them before anything posts to the live books. You keep design, sales and project management. It does not do tax preparation or audit, which stay with your CPA. If you run design-build work, see how we work with design-build firms or contact us.

Common questions

Is a design deposit revenue when I receive it?

Generally not. Money received before the work is done is usually a liability until earned. The correct treatment depends on your contract and accounting method, so confirm it with your CPA.

Should design and construction be separate jobs?

Keep one client record with separate phases, income accounts and cost codes. That gives you design margin and construction margin separately while keeping the combined view.

How do I track design hours?

Have designers and drafters log time by job and phase weekly, using a loaded hourly cost. Even rough time tracking is better than none, because it shows which projects run over budget.

What if I credit the design fee toward the build?

Record the design fee as earned when the design work is done, show the credit against construction billing, and review combined margin. The credit is a pricing decision, so make sure the build price still covers its costs.